|
Construction of a new building in the existing school yard in renovation of the scheduled building from 1847. The building is constructed according to the low-energy class 2 standard. Optimization of daylight conditions and installation of hybrid ventilation in all classrooms, with the exception of the gym, are highly emphasized features. The ventilation system is demand driven based on CO2 concentrations. Esbensen is responsible for energy, indoor climate and design of installations.
|